April 2013- Here is the latest shot of the Arizona Phoenix Temple. The steeple is now as complete as it will get until Moroni blows his horn sometime next month.
We missed going over last week with all that was going on, and going hiking instead of my weekly run to the temple on Monday.
What a pleasant surprise this Monday to find the steeple complete!
We cannot wait to see the doors and windows! It is really looking beautiful with all the little spikes (We think they look like agave leaves) coming up from the corners.

March 2013
The work was progressing on the steeple. Some delays due to not having the material ready from Texas, but all in all, going up pretty fast.
And as always, lots going on inside that we cannot see from out here.
February 2013
Here is a recent aerial shot of the temple. Gives you a better idea that it is pretty good size. It does not look that big from the front view.
Just another quick update on how the temple is coming along.
The other day I posted a couple shots trying to show the little corner spike at the back of the temple. Now they are on all four corners so you can see them better.

We do not know if they are also part of the Agave Leaf design used in the printwork and window design of the temple, but they are really interesting.

There are many variety of agave plants, but they do have a long spiky leaf, and when they bloom, it goes up a tall stem.
Agave nectar is also very commonly used here as a sweetener, like honey. Good stuff!
December-2012
Mid December they were caught up on placing all the outer walls that they could...the production in Texas could not keep up so they just stopped and worked on the inside until the second week of January.

Now they are back placing walls...the shorter upper section is pretty much up all around the temple at this point.
How about this rainy and cloudy day??? It really does not look like Phoenix at all, but we love it!
Just the spire will remain to be covered, and they expect to do that over the next couple of months. This will be difficult as there are many concave and convex shapes on the spire. It will be beautiful though!
As of December, the lower level of the Phoenix Temple is close to complete in the precast concrete exterior.

Monday Dec. 3, this is how the front looked.
They were putting on the beginning of the front panels of the patio area on the front of the temple.
The roof of the patio is complete and they were ready for the crowning piece of the entry.
Luckily, Elder Winchell let us know that they would be installing this piece on Tuesday Dec 4 between 7 and 7:30 AM, so I was able to be there to photo document it.
Brother Simonson was also there...but we were the only two other than site workers who were there. It was amazing!
And up it went.
After they rested it on the ground for a photo op for the site managers, it was hauled back up and onto the porch area.
And HERE IT IS!
HOLINESS TO THE LORD
HOUSE OF THE LORD
This phrase is on most LDS temples, stating what this house is. It is the Lord's house.
It is a holy place.
I am grateful for temples and the promises that I have made to follow Jesus Christ, and the blessings that have been promised me in return. I am experiencing those blessings in great abundance every day with many more in store!